Assembly Line Worker Assignment and Balancing Problem by Considering Labor Cost
Abstract
Keywords
References
- 1. Serin, F., Mete, S., Çelik, E., “An efficient algorithm for U-type assembly line re-balancing problem with stochastic task times”, Assembly Automation, 39(4):581–595, (2019).
- 2. Baykasoğlu, A., Dereli, T., “Two-sided assembly line balancing using an ant-colony-based heuristic”, International Journal of Advanced Manufacturing Technology, 36(5/6):582-588, (2008).
- 3. Make, M. R. A., Rashid, M. F. F. A., “Optimisation of Two-sided Assembly Line Balancing with Resource Constraints Using Modified Particle Swarm Optimisation”, Scientia Iranica, DOI: 10.24200/SCI.2020.52610.2797
- 4. Rabbani, M., Manavizadeh, N., Shabanpour, N., “Sequencing of mixed models on U-shaped assembly lines by considering effective help policies in make-to-order environment”, Scientia Iranica, 24 (3), 1493-1504, (2017).
- 5. Ege, Y., Azizoglu, M., Özdemirel, N.E. “Assembly line balancing with station paralleling”, Computers and Industrial Engineering, 57(4):1218-1225, (2009).
- 6. Yeh, D.H., Kao, H.H. “A new bidirectional heuristic for the assembly line balancing problem”, Computers and Industrial Engineering, 57(4):1155-1160, (2009).
- 7. Scholl, A., Becker, C. “State-of-the-art exact and heuristic solution procedures for simple assembly line balancing”, European Journal of Operational Research, 168(3):666-693, (2006).
- 8. Becker, C., Scholl, A. “A survey on problems and methods in generalized assembly line balancing”, European Journal of Operational Research, 168(3):694-715, (2006).
Details
Primary Language
English
Subjects
Engineering
Journal Section
Research Article
Authors
Hamid Yılmaz
*
0000-0003-0852-4119
Türkiye
Publication Date
June 8, 2022
Submission Date
March 24, 2021
Acceptance Date
May 17, 2021
Published in Issue
Year 2022 Volume: 6 Number: 1
